Installation and maintenance

1、 Preparation before paving:

1. Clean the ground thoroughly to ensure that there is no floating soil and construction waste on the ground;
2. The ground is flat, and the longitudinal and transverse flatness is detected with 2m guiding rule, and the maximum error shall be ≤ 2mm and reach the self leveling standard;
3. The moisture content of the ground should be less than 12%, and wetland construction is strictly prohibited. Interior decoration units should do a good job of moisture-proof treatment near the water source to ensure no water seepage and water leakage;
4. The layout of pipelines and lines laid in the room shall be clearly indicated to prevent damage during construction;
5. The client should work out a reasonable pavement plan with the installation workers, including the floor direction of each room.

2、 Two kinds of conventional paving technology for floor heating

1. Suspended pavement

1.1. The moisture-proof PVC floor mat should not be overlapped on the whole floor. The joints should be bonded with adhesive tape, and the wall edge should be turned over for 50 mm;
1.2. A certain thickness of wood wedge should be added in the fixed space between the floor and the wall to keep the space between the floor and the wall 8mm-12mm;
1.3. Staggered joint pavement shall be adopted, and the cross spacing between the ends of two adjacent rows of floors in the length direction shall be no less than 200 mm;
1.4. The width of the first row of floors in the same room should be greater than or equal to 50 mm;
1.5. The flat buckle floor can be properly glued at the joint of tenon and groove. After the floor is assembled, the adhesive squeezed on the floor surface should be removed timely;
1.6 when the width of floor pavement is more than or equal to 8m, partition expansion joint shall be reserved, and buckle strip shall be used for transition;
1.7. At the joint between the floor and other floor materials, the expansion joint ≥ 8mm shall be reserved, and the buckle transition shall be installed;
1.8. Before installing the skirting board, the wooden wedge must be taken out first, and the ends and two sides of the flat buckle floor shall be filled with styrofoam, and the connection points shall be made, but the glue shall not be filled;
1.9. During the installation of skirting board, attention should be paid to the drilling on the wall surface, and the pipes and pipelines should not be damaged, and the foot line should be installed smoothly, the joints should be tight and the height should be consistent.

2. Adhesive pavement

2.1. Except for laying moisture-proof light cushion film on the ground, other processes refer to the above practice;
2.2. After applying glue on the back of the floor or on the ground, stick the wood floor block by piece to the ground according to the pavement scheme;
2.3. When bonding the floor, it is necessary to use a special wooden hammer to knock tightly, and use sandbags to compact the joint of wood floor end;
2.4. The scheme is limited to the indirect heating of water heating pipe, not suitable for the installation of electric heating floor;
2.5. The floor paved with glue should be cured for 24h before use.

 

3、 Completion acceptance specifications and requirements:

1. According to the national standards, both the supplier and the Demander shall complete the acceptance within three days after the installation of the single floor project is completed;
2. The surface of the floor should be clean and smooth. The appearance quality of floor should meet the requirements of corresponding product standards;
3. The floor should be laid firmly without obvious abnormal sound and serious hollowing when trampling;
4. The reserved expansion joint shall be appropriate, and the installation of buckle and skirting line shall be straight and firm.

4、 Use standard and maintenance

1. Before the ground heating floor system is started, it is necessary to check the power supply line, water pipe line, temperature controller and other display must be normal. Kitchen, toilet and other water sources need to be careful to prevent water seepage under the floor, otherwise it will lead to the floor damp, mildew, arched and wire short circuit and other phenomena;
2. For the first time or in season change, the floor temperature should be increased by 2% per hour ° It is appropriate to increase the temperature by 10 on the same day ° It can only be set to 27 in three days ° Within. If the temperature is too fast, it will cause rapid shrinkage, cracking, distortion, tile shape or deformation of the floor.
3. It is suggested that the indoor temperature of ground heating should be between 18-20 °, It should not exceed 27 ℃, otherwise the service life and cycle of wood floor will be affected;
4. Whether the heating system is on or not, the indoor humidity is less than or equal to 40 °, Humidifier should be used to humidify the room in time. If it is too dry, the floor surface will be cracked and deformed( It is recommended that indoor temperature and humidity meters be equipped)
5. Use environment of floor, such as humidity ≥ 80 ° Attention should be paid to proper window ventilation or dehumidifier such as air conditioning to prevent floor moisture absorption and arching; If not live for a long time, should be appropriate to maintain ventilation.
6. Be careful not to scratch the wood floor with sand and sharp tools; Carry heavy objects, furniture, etc. to lift appropriate, do not drag, lest scratch. Elastic pad with adhesive should be used under furniture legs.
7. Prevent and avoid long-term sunlight exposure. It is not suitable to cover the surface of wood floor with impermeable material more than 1.5mm for a long time. It is not suitable to use high-power electrical appliances directly on the wood floor;
8. It is forbidden to contact open fire on the wood floor, and it is not allowed to use chemical substances such as gasoline, diesel oil, acid and alkaline to scrub and corrode the floor;
9. Clean the floor with a soft and wet mop that doesn't drip water. It is suggested to use special wood essential oil twice a month.

Product Center

News Center


Scan and enter mobile website

Pay attention to Nanyang wood's official wechat
Service hotline

Fax: 0519-86466668
Address: South District, Wujin high tech Development Zone, Changzhou
Email: webmaster@byhtea.cn

Copyright © two thousand and seventeen   Jiangsu Nanyang Wood Industry Co., Ltd. all rights reserved【 Website background management       Su ICP Bei 13052924-1    Power of Chinese Enterprises Provide technical support